New foundations have been dug out and poured, and base plates installed, ready for the steel frame which will start arriving over half-term.



Some of the old walls which are being re-used, have been underpinned.


 We could use one of these for changing lightbulbs!


The variation in floor/ground levels both inside and outside the building is creating some interesting challenges.
 