Tuesday, 30 April 2013

And the walls came tumbling down . . .


Demolition work is almost complete and should finish this week.  The next step is preparing for the foundations by setting out the building and levelling for the footings, before pouring concrete for 50% of foundations and installing hold-down bolts for the steelwork.

You can see some different phases of previous extensions here – the blockwork resources room from 1985 (then in use as the crèche), and behind it the brick wall of the 1970 extension.